Staging plan
Setting Out · Phase 07 — Costing, quoting and contract
Upload your staging plan
A marked-up site plan or programme showing each stage, the area of the block it covers, its budget and its target season.
Your stages, with a budget and a target season for each
Break at trade boundaries, not mid-trade. Seasons as a Perth window — March–May, June–August, September–November, December–February.
| Stage | Works included | Budget | Target season |
|---|---|---|---|
Where do services and drainage sit relative to the surfaces above them?
Stormwater, soakwells, sleeves and conduit are deep and permanent. Name the stage each lands in, and the surface it ends up under.
Where does the irrigation sit relative to the soil and the planting?
Mainline, valves and wiring go in before the paving; laterals and dripline after the imported soil and before the plants. Say which stage each half is in.
What the garden looks like at the end of each stage
One line per stage. If you cannot write that line, the stage boundary is in the wrong place.