Services plan
Setting Out · Phase 03 — Site analysis
Upload your marked-up services plan
Show the sewer line and access chambers, the water main and meter, power, gas, comms and every retic line and valve, with the depths you potholed.
Your BYDA enquiry sequence number and the date you lodged it
Plans come from each asset owner, not from BYDA. Allow up to two business days, and lodge again if the scope changes or the validity dates expire.
Every service you located
A row each for the sewer line, the water main and meter, overhead power, underground power, gas and comms. Depth is what you measured when you potholed, not what the plan implies.
| Service | Where it runs | Depth (mm) | How you located it |
|---|---|---|---|
Sewer access chambers and inspection openings
Where each one is and what it constrains. They must stay accessible and at finished level, so they set your paving levels as well as your plan.
Existing retic — lines and valves
One row per station. No asset owner has a plan for this, so run each station off the controller and trace the wire to the solenoid.
| Station | What it waters | Valve location | Mainline route |
|---|---|---|---|
Your marked-up services plan — scale, date, where the file lives, and what marking it up revealed
Name the thing that surprised you. That is usually the constraint Phase 5 has to design around.