Irrigation as-built and audit
Setting Out · Phase 08 — Build
Upload the as-built
The marked-up plan and the open-trench photos, showing the mainline route, every valve box and which station is which, taken before backfilling.
The mainline route
Where the mainline runs, from the cut-in to the last valve. Dimension it off permanent features — the meter box, a building corner, a fence post — not a garden bed that will move.
Valve positions
Two offsets to every valve box, each measured from something that will still be there in ten years.
| Valve / station | Where it is | Offset 1 | Offset 2 |
|---|---|---|---|
Station numbers, what each covers, and the audit results
One row per station. Pressure is measured at the furthest head, under normal operating conditions. Run times come from the audit, not from a guess.
| Station | What it covers | Pressure at furthest head (kPa) | Catch-cup DU (%) | Final run time (min) |
|---|---|---|---|---|
Where the as-built record lives
The marked-up plan and the open-trench photos — where they are filed, and the date you recorded them.