Your project workbook — what you will have produced by the end
Every phase produces a real document. Stacked together they are a professional landscape design package for your own property, and the reason this course is worth more than watching videos.
This course is not a reading list. Thirty of its lessons end by asking you to produce a document about your own block — a measured plan, a soil report, a quantity take-off, a defect list. Those thirty documents are the point. Stacked in order they are a landscape design and construction package for your property, the same package a designer would charge you for, except that you understand every page because you wrote it.
This lesson is the ten minutes you spend deciding where that package lives before you start filling it.
What a professional does at this stage
A landscaper opens a job file before they open a ute door. Everything measured, photographed, quoted, changed or paid gets written into it, on the day, with a date. Not because they enjoy admin — because four things go wrong without it.
Quoting. You cannot price what you have not measured. A designer who loses their site notes does not re-guess the numbers, they drive back out — an hour of someone’s day, or on your own project, a Saturday.
Disputes. In WA a home building work contract must be in writing and signed by both parties, and the deposit before work starts is capped at 6.5 per cent — see Building and Energy. A complaint about that contract has to be lodged within three years. Every one of those protections is worth exactly as much as your ability to produce the document. A verbal variation agreed on site is not a variation, it is two people’s memories, and they will differ by about $3,000 by the time the job ends.
Handover between trades. The retic contractor needs the drainage layout; the paver needs to know where the sleeves went. On a professional job that information is on paper. On yours it has to come from you.
Future you. Everything under the ground goes invisible the moment it is backfilled, and stays invisible for the twenty years you own the house.
There is a fifth benefit specific to a homeowner. If you put the work out to three Perth landscapers, handing all three the same plan and the same written specification is the only way the three prices mean anything. Three quotes against three different assumptions is not a comparison.
What each phase deposits
| Phase | What it deposits | What the next phase does with it |
|---|---|---|
| 1 Trade and process | Project charter | Sets the rules you will hold yourself to |
| 2 Brief | Design brief | The document the whole design is later judged against |
| 3 Site analysis | Base plan, levels survey, soil report, sun and wind analysis, services plan, existing garden audit, constraints and opportunities plan | Everything the design must obey |
| 4 Approvals | Your water rules | What you are allowed to build and water |
| 5 Concept design | Zoning diagram, material palette, hydrozone plan, concept plan | The agreed shape of the garden |
| 6 Documentation | Grading plan, drainage plan, planting plan and schedule, specification and schedule of works | What gets built, and by whom, in what order |
| 7 Costing | Quantity take-off, cost plan, staging plan | What it costs and what happens first |
| 8 Build | Available water measurement, irrigation as-built | Proof of what is actually in the ground |
| 9 Handover | Defect list, as-built drawings, maintenance manual | The record you own the garden from |
| 10 Maintenance | Seasonal calendar, retic audit record | Keeping it alive through a Perth year |
| 11 Review | Project review, project portfolio | Honest assessment against the brief |
Thirty documents. You have already produced one if you did the project charter.
Where to keep it
If you have an account on this site, each deliverable saves as you write it and assembles at /my/workbook/ in course order, with a counter, a print button and a download-as-Markdown button so you can take the whole set elsewhere. Nothing is hidden behind the account — every lesson is readable signed out.
A hardcover notebook works just as well. This is not a trick answer — the trade ran on carbon-copy site books for fifty years. What a notebook does not do is back itself up, so photograph its pages occasionally.
Either way you need somewhere for the things that are not text: photos,
receipts, quotes, PDFs of plans, the emailed asset-owner drawings. One folder,
one hierarchy, backed up somewhere that is not the phone in your pocket. Name
files so they sort themselves — 2026-08-02-back-corner-northwest.jpg, not
IMG_4471.jpg. Keep every receipt, including the $40 ones. If you ever sell,
rent out or insure the improvement, what the work cost is a question someone
asks, and receipts are the only answer that counts; ask your accountant how long
to hold them.
Taking “before” photos you can actually repeat
Most people take fifty before photos and none of them are comparable to anything, because every shot is from a different spot at a different height on a different lens. The discipline that fixes it is called photopoint monitoring, and the DWER guide is the free WA reference. Its core warning: small changes in position, height, angle or direction have a large effect on your ability to see change.
Set up six to ten fixed positions and shoot the same set every time.
- Choose the positions. Each corner of the back garden looking in, standing at the back door or alfresco, the view from the window you look out of most, down the side access, and from the verge looking at the house. Add one close position per problem area.
- Fix the spot and the aim. Stand on something that will not move — a specific paver corner, the edge of the slab, a peg. Aim the centre of the frame at a fixed object still there in two years: a fence post, the downpipe, the meter box. Note the compass bearing off your phone as backup.
- Fix the height. Eye level, roughly 1.5 metres, and hold it. Crouching for one shot and standing for the next ruins the pair.
- Fix the lens. Modern phones have three. Pick the main one, use it every time, and never let it slip to 0.5x ultrawide — the guide is explicit that wide-angle and telephoto alter perspective and make a shot impossible to repeat. Landscape orientation, highest resolution, two shots each.
- Pick your light. Bright overcast, early morning or late afternoon. A Perth midday summer sky gives you blown highlights and black shadow, and nothing in either.
- Write the set down. Position number, what it aims at, bearing, height. That sheet is what lets you repeat the set in eight months.
Then repeat: before anything happens, after demolition, after earthworks, before each backfill, at completion, and each season afterwards.
The photos that pay for themselves
- Every open trench, with a tape measure in shot, before it is backfilled. Retic mainline, laterals, sleeves under paving, conduit, drainage runs. This is the highest-value photo set on the whole job, and it feeds as-built drawings.
- The existing retic controller program, before you change a setting. It tells you how the garden has been watered for years.
- Cracks that already exist — in the neighbour’s fence, the driveway, the render, the paving — before machinery arrives. Dated photographs are what end the argument about who cracked what.
- Deliveries, so quantities can be checked against invoices.
Photograph trenches from the edge, standing back from the spoil. Do not climb into an unsupported excavation to get a better angle; trench collapse is a routine way to be killed on a small site, and no photo is worth it.
What the finished set is worth
Comparable quotes. Variations you can price instead of argue about. A council enquiry answered in one email. A maintenance manual that tells you what the plant in the west bed actually is. An as-built plan that means the next trench you dig misses your own irrigation mainline. And an honest review against the brief, which is only possible because you wrote the brief down.
That is the end of Phase 1. The next phase starts the way every professional job starts: with the enquiry call, and the questions a good landscaper asks before they will even quote a site visit.
Checklist
- Understand what each phase deposits into the workbook
- Set up somewhere to keep photos, receipts and measurements
- Take your "before" photos from fixed positions you can repeat
Where to go deeper
Every link below was fetched and checked before it shipped. Nothing here is a guess.
- Freegovernment20 minPerth / WA
Photopoint monitoring: a guide to establishing sites and taking consistent photos
Department of Water and Environmental Regulation
Why this oneA free 18-page WA government guide to the exact skill this lesson asks for — taking photographs from a fixed position that can be repeated years later and honestly compared. It gives the method (a photopoint that sets position and height, a sighter object that sets direction and angle, a recorded compass bearing as backup), the rules for the camera (highest resolution, fully zoomed out, landscape orientation, no wide-angle or telephoto because it alters perspective and makes the shot impossible to repeat), and the conditions to shoot in (bright overcast beats bright sun; avoid glare and hard shadow). The worked before/during/after sequences are Perth sites — Bickley Brook and Wungong Brook.
Change this for PerthWritten for river restoration and citizen science, so it assumes star pickets, GPS coordinates and a site nobody owns. On a 600 square metre block you do not need any of that — the transferable parts are the fixed position, the fixed aiming point, the fixed camera height, the one lens, and the field sheet that records all of it.
Link checked 2 Aug 2026
- Freegovernment15 minPerth / WA
Building or renovating your home
Building and Energy, Government of Western Australia
Why this oneThe regulator's own summary of what paperwork you are legally entitled to and obliged to keep. It sets out that home building work contracts must be in writing and signed by both parties, that the Home Building Contracts Act 1991 provisions apply to fixed-price contracts between $7,500 and $500,000, that the maximum deposit before work starts is 6.5 per cent, and that a home building work contract complaint must be lodged within three years of the contract date or the cause of action arising. Read it before you sign anything, not after.
Change this for PerthThe page refers to the regulator by its current departmental initials, which have changed more than once in recent years — the function is Building and Energy either way. Thresholds are set in legislation and do get amended, so confirm the current figures on this page on the day you sign rather than trusting a number you read months earlier.
Link checked 2 Aug 2026
- Paid · $33.90 for a digital copygovernmentPerth / WA
Order a Certificate of Title
Landgate
Why this oneThe single cheapest way to find out what is legally attached to your block before you design on it. The title lists registered interests — easements, covenants, notifications and caveats — plus the survey plan number and, where available, a title sketch. Order it with a street address, pay by card, and it arrives as a PDF by email within 30 minutes. A sewer easement or a restrictive covenant you discover in Phase 6 is a redesign; the same information on day one is a constraint you design around.
Change this for PerthFree alternative: you were given a copy of the title in your settlement paperwork when you bought the house, so check that first. Buy a fresh one if the settlement pack is missing, if the property has changed hands or been subdivided since, or if you simply cannot find it. Landgate fees are regulated and rise with CPI each year, so confirm the current price at checkout.
Link checked 2 Aug 2026
- Freegovernment10 minAustralian
Before You Dig Australia — for homeowners
Before You Dig Australia
Why this oneThe free national enquiry service that emails you the asset owners' plans for your address, and the page states plainly what to do with them afterwards: 'Keep a record of the information and any notes you make.' Those plans are a workbook document, not a one-off email — they get referenced again at excavation, at drainage, and at every future trench. It also carries the warning that matters: the plans you receive are indicative only.
Change this for PerthIndicative means the drawing shows roughly where an asset was meant to go, not where it is. In Perth the private side of the boundary — retic mainline, pool plumbing, conduit to a shed, unregistered power to a pergola — is on nobody's plan at all. Phase 3 covers proving it on the ground.
Link checked 2 Aug 2026
- FreedirectoryPerth / WA
Josh's House resources
Josh Byrne & Associates / Curtin University
Why this oneThe best free look at what a fully documented Perth project actually contains. Josh Byrne published the plans, factsheets, photo album, video series and a live monitoring data portal for two water-sensitive houses in Fremantle, and states the resources are free to use and share with acknowledgement. Useful here as a target: this is the standard of record a professional keeps, and it is what your own workbook is a domestic-scale version of.
Change this for PerthThe project covers building fabric, energy and water as well as landscape, so skim past the parts that are not about the garden.
Link checked 2 Aug 2026
The rules, with sources
WA regulation changes. Each point below names its primary source and the date it was last checked — always confirm with your own council before you build.
Home building work contracts in Western Australia must be in writing and signed by both parties. The Home Building Contracts Act 1991 provisions apply to fixed-price contracts for home building work valued between $7,500 and $500,000, and the maximum deposit that can be required before work starts is 6.5 per cent.
Building and Energy, Government of Western Australia ↗ · checked 2 Aug 2026
A home building work contract complaint must be lodged with the WA building regulator within three years of the contract date, or of the cause of action arising.
Building and Energy, Government of Western Australia ↗ · checked 2 Aug 2026