The constraints and opportunities plan

Everything from this phase, on one drawing. This is the document a designer works from, and it is the reason a professional design fits its site while an amateur one fights it.

⏱ 90 minIntermediate🔗 6 resources (5 free)

You now have nine lessons’ worth of findings about your block, and they are scattered. A base plan in one file. Spot levels in a notebook. Photographs of a soil hole. A Before You Dig response pack as a PDF. A spreadsheet of every plant with a keep-or-kill verdict against it.

Nobody can design from that, including you in three weeks’ time.

This lesson turns all of it into one drawing. In practice it is the last thing that happens in site analysis and the first thing that gets opened in concept design, and the quality of everything downstream is limited by how honest it is.

What a professional actually does here

In a landscape architecture practice this drawing is a numbered, issued, billable deliverable. It goes to the client before a single design idea is shown, and it exists for four reasons.

It converts findings into spatial facts. “The soil is sand over limestone at 400 mm” is a note. A hatched zone across the northern third of the block reading limestone at 400 mm — excavation cost, restricted rooting depth is something you can design around, because it has a location.

It surfaces the collisions early. The moment everything is on one sheet, the conflicts appear: the only level, sunny, sheltered corner is directly over the sewer junction. The tree you want to keep sits where the machinery has to come through. Finding that on paper costs an afternoon. Finding it mid-build costs thousands.

It is the document you argue from. When the client wants a pool on the west boundary and the drawing shows the setback, the drainage low point and the neighbour’s overlooking window, the conversation is about facts rather than taste.

It records what was known. If a constraint is on the drawing and the client chose to proceed anyway, that is documented. This is not paranoia; it is the difference between a professional practice and a bloke with a bobcat.

The framing that matters most: constraints are not obstacles, they are the other half of the brief. A design that appears to fit its site effortlessly is almost always one where every constraint was known before the pen moved.

What goes on it, and where it comes from

Layer Source lesson
Boundaries, buildings, existing hard surfaces, dimensions Measuring up
Spot levels, falls, high and low points, datum Levels, falls and datum
Soil type, depth to limestone, coffee rock or clay Perth soils and soil testing
Sun arcs, shade at 15:00 in January, hot west walls, sea breeze Sun, shade and aspect
Downpipes, soakwells, surface flow, the puddle that never dries Water on site
Sewer, water, power, gas, existing retic, easements Locating services
Keep / kill / salvage verdicts on plants and structures Auditing an existing garden
Tree protection zones and retained trees Tree assessment

If a row is blank, go back and fill it. A constraints plan with a hole in it is worse than none, because you will design straight into the hole.

How to draw it

Work in overlays, then flatten

Print your base plan at 1:100 — several copies, and never draw on the original. Then build it up in layers on tracing paper or as separate layers in whatever software you are using, roughly four:

  1. Legal and services — boundaries, setbacks, easements, sewer, water, power, gas, retic.
  2. Environment — sun and shade, wind, water movement, soil zones.
  3. Existing garden — retained plants, tree protection zones, surfaces to keep, structures to demolish.
  4. Operations — access routes, stockpile areas, spoil, crossover.

Then flatten to one sheet. The flattening is where the thinking happens, because that is where you find out which layers collide.

Use a consistent graphic language

Convention Meaning
Red Constraint
Green Opportunity
Orange or a “?” flag Assumed, not yet verified
Solid line Absolute — cannot move
Dashed line Negotiable, or subject to approval
Hatched area A zone, not a line
Arrow Direction — wind, view, fall, access

The hatching rule is the one people get wrong. A tree protection zone, a sewer clearance, afternoon shade and a drainage low point are all areas. Drawn as lines they invite you to design right up to them.

Every version gets a north arrow, a scale, and a date. Site analysis has a shelf life — a neighbour builds a two-storey and your shade drawing is wrong.

Annotate with facts, not adjectives

“Hot” is useless. “West-facing rendered wall, 2.4 m, in full sun from 13:00, still radiating at 19:00 in February” tells the designer to plant a deciduous screen, build a pergola, or move the seating.

Every annotation should carry a number, a time, a direction or a depth. If it carries none of those, you have written an opinion.

The WA layers people forget

Generic site analysis advice will not prompt you for these. On a Perth block they are often the expensive ones.

  • Depth to limestone or coffee rock, drawn as a zone. It sets your excavation method, your machinery, your drainage and your tree choices.
  • Side access, measured at the pinch point. Not the gate width — the narrowest point between the house and the fence, usually where the meter box or the aircon condenser sits. Note overhead clearance too (eaves, the service line to the house). This single number decides bobcat versus wheelbarrow, and it is a multiplier on your labour cost in Phase 7.
  • The verge and crossover. Where materials can be stockpiled, where a truck can stand, and whether there is a council street tree with its own protection requirements.
  • The Fremantle Doctor. The afternoon south-westerly is an opportunity, and a solid 1.8 m screen on your south-west boundary throws it away. Draw it as an arrow, in green.
  • Winter sun into the house. The northern aspect is the one asset you cannot buy. Mark where winter sun reaches the living areas and do not plant an evergreen in it.
  • Bushfire prone designation, if you are on the fringe — Roleystone, the hills suburbs, the bushland edges out north. It is a yes/no flag here and a Phase 4 problem.
  • Overlooking, drawn as a cone from the neighbour’s upper window, not a dot.

Mark the opportunities, not just the problems

This is the half that gets skipped, and it is why amateur plans read as defensive. Work through the constraint list and ask what each one enables.

  • Deep summer shade under a retained marri or jacaranda is the only place anyone will sit in February. That is the outdoor room, already located.
  • The area you cannot build over because of the soakwell is a perfectly good lawn or low garden bed.
  • A north-facing wall is a winter sun trap and a place for espalier or citrus.
  • The one genuinely level area is the cheapest square metres on the site — that is where the large paved space belongs unless there is a reason otherwise.
  • A mature tree is fifteen years you cannot purchase.

Reading it like a designer

When the drawing is finished, interrogate it with the three questions a designer asks:

  1. Where is the site telling me to put the main outdoor space? Usually the intersection of shelter, level ground, summer shade, winter sun and short travel from the kitchen door. Often there is only one such place, and the drawing hands it to you.
  2. What can never move? Services, retained trees, boundaries, and levels against the house. Everything else is negotiable.
  3. Where is the money? Which parts of this site cost three times as much per square metre — limestone, steep fall, no machine access — and is the design putting the expensive work there for a good reason?

If you cannot walk someone through the drawing in five minutes, it is either incomplete or over-drawn. Both are fixable in one more pass.

Where this goes next

Phase 4 takes each hard constraint and asks whether it triggers an approval — the R-Codes and your council for setbacks and boundary walls, and bushfire and dieback if the map flagged your lot.

Then Phase 5 puts tracing paper over this exact sheet and starts drawing bubbles. Functional zoning is literally this drawing with activities laid over it — which is why the effort you spend here is the cheapest design work you will ever do.

Do this on your own block

Field journal entry

Constraints and opportunities plan

Produce a single annotated overlay on your base plan marking every constraint (services, easements, setbacks, shade, root zones, poor drainage, hot walls, overlooking, access limits) and every opportunity (good views, sheltered corners, existing mature planting, level areas, sun in winter).

Sign in to write this straight into your project workbook — or just keep it in a notebook.

Checklist

  • Every constraint from this phase appears on the drawing
  • Every opportunity is marked, not just the problems
  • Access routes for machinery and materials are shown
  • You can explain the plan to someone else in five minutes

Where to go deeper

Every link below was fetched and checked before it shipped. Nothing here is a guess.

  • Freearticle40 minOverseas — adapt it

    Landscape Design — site analysis and base map (Extension Gardener Handbook, ch. 19)

    NC State Extension

    Why this oneThe clearest free explanation of the exact drawing method this lesson teaches — build a scaled base plan, then record findings on tracing paper overlays, one layer per theme, before any design happens. It walks through the site inventory, the separate environmental analysis overlay covering sun, shade, wind, sights, sounds, soils and water, and then the bubble diagram that sits on top. It also uses triangulation to fix tree positions from two known points, which is the same technique used in the measuring lesson here.

    Change this for Perth

    Written for the northern hemisphere and in imperial units. Flip the sun: north-facing is the warm aspect in Perth, not south, and every sun-path diagram in it is mirrored. Ignore the recommended 1 inch = 10 feet scale and use 1:100 (or 1:200 on a big block), and call Before You Dig Australia rather than 811. The drawing method itself transfers unchanged.

    Link checked 2 Aug 2026

  • Freearticle30 minPerth / WA

    Josh's House — downloadable plans

    Josh Byrne & Associates / Curtin University

    Why this oneA real, fully documented Perth project you can open and read as PDFs — Landscape Concept, Landscape Design, Integrated Water System Design (hydrozoning, greywater, bore) and Irrigation Design, plus a Sustainability Feature Plan that puts everything on one sheet. Studying how a professional annotates a Perth block, and how much information one drawing can carry without becoming unreadable, is worth more than any generic tutorial. The resources are free to reuse with acknowledgement.

    Change this for Perth

    These are the outputs of the design phase, not a constraints and opportunities plan. Read them for graphic convention, annotation density and layering — not as a template for this deliverable. Fremantle sand over limestone will not match a Bassendean block in Gosnells.

    Link checked 2 Aug 2026

  • Free tier · Free to view; aerial imagery extracts from $0.64 per MB up to $95.50 depending on formattool20 min for your lotPerth / WA

    Map Viewer Plus

    Landgate

    Why this oneThe WA land information authority's own map viewer. Free to browse your property and administrative boundaries and cadastral survey data, which is how you confirm where your title boundary actually sits before you draw a setback line off a fence that may not be on it. From the same window you can buy the title, survey plans and aerial imagery if you need them.

    Change this for Perth

    Viewing is free but products are paid, and the imagery pricing above is what Landgate published on the day this was checked. The boundary shown on screen is indicative, not a survey — if a boundary dispute is possible, that is a licensed surveyor's job.

    Link checked 2 Aug 2026

  • FreegovernmentReference documentPerth / WA

    Residential Design Codes (State Planning Policy 7.3)

    Western Australian Planning Commission

    Why this oneThe primary source for residential setbacks, open space, boundary walls and outdoor living areas across Western Australia, and therefore the source of several of the hard lines on your drawing. Volume 1 (April 2026 edition) is the one that covers single houses and grouped dwellings. The page also links the Explanatory Guidelines and Practice Notes, which are the documents that tell you how a planner will actually interpret a provision.

    Change this for Perth

    The R-Codes are read together with your local planning scheme and any local planning policy, and councils vary the provisions. Confirm the numbers that apply to your lot and your R-code with your council before you commit them to the drawing.

    Link checked 2 Aug 2026

  • Freegovernment15 minPerth / WA

    Building on a residential property near Water Corporation assets

    Water Corporation

    Why this oneThe rule that catches Perth renovators: you must establish where Water Corporation assets sit before you lodge anything, and clearance requirements apply to houses, sheds, garages, carports, pools, spas and retaining walls. It sets different clearances for structures on piles and structures without them, and requires piles to be founded at least 300 mm below the zone of influence or to refusal in stable rock. Easements can often be built over if the technical guidelines are met — which is why you draw them as a zone with a note, not as a no-go.

    Change this for Perth

    The specific clearance distances are in the linked Residential guidelines for designers PDF, not on the page itself. Get the number for your asset and your structure from Water Corporation rather than assuming a figure.

    Link checked 2 Aug 2026

  • Freegovernment10 minPerth / WA

    Bush fire prone areas

    Department of Fire and Emergency Services (DFES)

    Why this oneTells you whether your lot is inside the Map of Bush Fire Prone Areas, which is designated by the Fire and Emergency Services Commissioner and maintained by the Office of Bushfire Risk Management. It matters on this drawing because designation can bring additional planning and building requirements under State Planning Policy 3.7, which flow through to deck materials, structures near the house and what you plant in the first few metres.

    Change this for Perth

    Designation is lot-scale and does not tell you your BAL rating — that comes from an accredited bushfire practitioner assessing vegetation, slope and separation. Treat the map as a yes/no flag on the drawing and follow it up in Phase 4.

    Link checked 2 Aug 2026

The rules, with sources

WA regulation changes. Each point below names its primary source and the date it was last checked — always confirm with your own council before you build.

  • Residential setbacks, open space and outdoor living area requirements in Western Australia are set by State Planning Policy 7.3 Residential Design Codes, with Volume 1 covering single houses and grouped dwellings, read together with the local planning scheme.

    Western Australian Planning Commission ↗ · checked 2 Aug 2026

  • Water Corporation requires minimum clearances between residential structures and its assets, with different distances for structures on piles and structures without piles; where piles are required they must be founded at least 300 mm below the zone of influence or to refusal in stable rock.

    Water Corporation — Building on a residential property ↗ · checked 2 Aug 2026

  • Land in Western Australia identified as having the potential to be impacted by bushfire is designated by the Fire and Emergency Services Commissioner on the Map of Bush Fire Prone Areas, and additional planning and building requirements may apply to development within those areas.

    Department of Fire and Emergency Services (DFES) ↗ · checked 2 Aug 2026