Garden lighting installation
Running low-voltage cable, positioning fixtures, transformer sizing and voltage drop over long runs — and the clear line in WA between what you may wire yourself and what requires a licensed electrical contractor.
⏱ 90 minIntermediateNot written yet
Not planted yet — but the plan for it is final
The practical task and the checklist below are exactly what this lesson will teach. What is missing is the written explanation and the curated links, each one fetched and verified before it ships.
In the meantime the checklist is genuinely usable on its own. Take it outside.
Checklist
- Cable runs installed before surfaces and planting
- Transformer sized with headroom, and voltage drop calculated over long runs
- Fixtures aimed and shielded to avoid glare into windows
- All mains work done by a licensed electrician with a certificate